Second floor lobby construction

Description

This photo, looking toward the stairway in the second floor lobby, was taken during construction in the Central Library. The empty lobby area looks virtually finished except for the floor, where a few construction materials and a toolbox are scattered around. This photo shows the staircase extending to the third floor, the arches and columns in the lobby, and a portion of the ceiling and molding.

Collections with this item

Details

Extent

  • 10x8 inches

Digital Publisher

Subject.Place

Rights & Usage

No known rights (no copyright or related rights are known to exist for this work).

Identifier

  • MCLHPA0112

Date.Range

Format.Original

File format

Add new comment

You must have Javascript enabled to use this form.