Central first floor lobby during renovation

Description

The first floor lobby is shown with newly exposed overhead beams during early stages of the 1994-1997 renovation. The view is looking southeast towards the lobby doors. In the 1950s, this checkerboard vinyl tile was laid over the lobby's original marble flooring. Because the marble flooring was not salvageable, new terrazzo flooring was installed.

Collections with this item

Details

Extent

  • 5.25x3.5 inches

Digital Publisher

Subject.Place

Rights & Usage

No known rights (no copyright or related rights are known to exist for this work).

Identifier

  • MCLHPA0270

Date.Range

Format.Original

File format

Add new comment

You must have Javascript enabled to use this form.